We are proud to be the best ranked Epoxy installer in Melbourne, operating since 2010 with over 2000+ garages installed.

The cost of a professional installation depends on the floor and the finish.
As a general estimate, our 5-coat flake system for double garage (typically 32-36m2) is priced $70/m² + GST which is around $2,200 + gst.

Please note all our products are commercial graded, 100% UV resistance and water proof .

2-Days Epoxy Flake Flooring System

Step-by-Step Process Breakdown:

Basic requirements prior start:
Site access, clear working area and power availability.

DAY 1 

Phase 1
Mechanical Surface Preparation
-All concrete (new or old) is mechanically ground using commercial diamond grinders.
-Removes contaminants such as sealers, paints, oils and laitance concrete.
-After grinding, floor area is vacuumed and blowed.

Purpose:
Creates a clean, open-pore surface for strong bonding and long-term durability.

Crack & Defect Repairs
Static cracks, pinholes, and surface defects are filled with repair mortar or crack filler.

Purpose:
Ensures a seamless and visually consistent finish.

Phase 2
Epoxy Prime & Base Coat Application
A high-build, 100% solids epoxy base coat is mixed on site.
Applied evenly and back-rolled for uniform thickness.

Full Broadcast Decorative Flakes
While the epoxy is still wet, decorative vinyl flakes are hand-broadcasted

Floor is left to cure overnight.

Purpose:
Decorative flakes will enhance look, hide blemishes, provides durability and an attractive, seamless appearance.

DAY 2 – Sanding, Sealing with Top Coat

Phase 3
Excess Flake Removal
Once epoxy is cured, all loose and excess flakes are sanded.
Floor is then cleaned thoroughly.

Purpose:
Creates a smooth, uniform surface ready for sealing.

Clear Protective Top Coat Application
A high-performance clear top coat (polyaspartic or polyurethane, depending on specification) is applied.
Applied evenly by roller to seal flakes and lock the system together.

Purpose:
Provides UV stability, water resistance and easy cleaning.

Curing & Usage:

Light foot traffic: typically 12–24 hours
Light furniture: typically 24-48 hours
Vehicle traffic: 4 days